Client:  City of Brampton
Project: T24-094 – Replacement of Complete Power Distribution, Asphalt Pavement and Light Standard and Elevator Upgrade at Professor’s Lake Recreation Centre
Closing Date and Time: Thurs. May 9, 2024 – 2:00pm
Estimator: Ahmed Abdelhamid – [email protected]

DOCUMENTS:

Tender Document (.pdf)
Tender – Alectra Drawings (.pdf)
Tender Drawings (.pdf)
Electrical and Mechanical Specifications (.pdf)
Elevator Specifications (.pdf)
Locates (.pdf)

Performance Bond (.pdf)
Labour and Material Payment Bond (.pdf)

Site Pictures (.zip)